GENERAL
•  

1.01 Summary and Introduction

•  

1.02 Submittals

•  

1.03 Material Acquisition - Lead Times - Storage - Handling - Delivery

    PRODUCTS
•  

2.01 General Description

•  

2.02 Material Content

•  

2.03 Provision and Fabrication Review

•  

2.04 Finishes Packaging

•  

2.05 Examination & Inspections

•  

2.06 Fabrication Venue

•  

2.07 Site Verification of Installation Conditions

•  

2.08 Material Mill Certification

    EXECUTION
•  

3.01 Installation Scheduling

•  

3.02 Installation Work Hours

•  

3.03 Building Corner Treatments

•  

 3.11 Exclusion

•  

3.04 Maintenance & Inspection

•  

3.05 Safety Precautions

•  

3.06 Product Performance - Design for Normal condition

•  

3.07 Heat Stress, Metal Deformation, Warping and Twisting

•  

3.08 Labor Code - Prevailing Wages

•  

3.09 Caulking/Flashing - Sealing

•  

3.10 Methods of Installation

•  

 3.12 Permits

•  

 3.12 Contracts and Purchase Orders

    WARRANTY
    SPECIFICATIONS OF THE ILLUSTRATED STYLES
    TYPICAL SPECIFICATIONS INTERNET SPECS

2.05 Examination & Inspections

A- Units will be quality checked before leaving factory, When B&C are contracted to install units B&C Project Manager to visit site and review conditions for installers never the less General Contractor must maintain their safety.