GENERAL
•  

1.01 Summary and Introduction

•  

1.02 Delivery, Storage and Handling

•  

1.03 Material Acquisition Lead Times - Delivery

•  

1.04 Project/Site Conditions - Field Measuring

    PRODUCTS
•  

2.01 General Description

•  

2.02 Material Content

•  

2.03 Provision and Fabrication Review

•  

2.04 Metals Color Finishes Color

•  

2.05 Examination & Inspections

•  

2.06 Fabrication Venue

•  

2.07 Site Verification of Installation Conditions

•  

2.08 Material Mill Certification

    EXECUTION
•  

3.01 Installation Scheduling

•  

3.02 Installation Work Hours

•  

3.03 Building Corner Treatments

•  

3.04 Maintenance & Inspection

•  

3.05 Safety Precautions

•  

3.06 Product Performance

•  

3.07 Heat Stress, Metal Deformation, Warping and Twisting

•  

3.08 Labor Code - Prevailing Wages

•  

3.09 Caulking/Flashing - Sealing

•  

3.10 Methods of Installation

    WARRANTY
    SPECIFICATIONS OF THE ILLUSTRATED STYLES
    TYPICAL SPECIFICATIONS INTERNET SPECS

2.07 Site Verification of Installation Conditions

Site Verification of Installation Conditions: As a condition of issue and acceptance of these submissions  Contractor agrees  to notify B & C when they have installed blocking in accord with B & C submittals. The exterior of the building must be completed sufficiently to permit B & C to install at which time B & C  will visit the job site “once only” and field measure for the units which will be customized as per approved submissions. Blocking is specifically excluded from B & C’s scope of work. Aluminum Shade Structures Scheduling and City inspections or coordination’s are excluded. During field measure it is beyond the scope or ability of B & C to examine work by others or inspect the project, blocking/backing (which may be covered) and it is the responsibility of the Contractors Project Manager to ensure that blocking  is correctly placed (as shop drawings illustrate) and work by others will not prevent B & C installers from proceeding. B & C Installers are instructed that where contractor fails to provide suitable conditions, backing as required or necessary work by others, B & C installers are to withdraw and await a change order for additional mobilization scheduled at  B & C’s convenience with consequent additional cost impact.